barn door track assembly

Dark Oil-Rubbed Bronze Decorative Sliding Door Hardware Stainless Steel Decorative Sliding Door Hardware Top Mount 79 in. Stainless Steel Barn Style Sliding Door Track and Hardware Set Ironwood Hardware - 7 ft. Loft Barn Door System - Dark Bronze - Nylon MK2 - Unfinished HeaderStainless Steel Top Mount Spoke Wheel Rolling Door Hardware Kit for Wood Doors Hook Strap Black Rolling Barn Door Hardware Kit with 5 in. Black Top Mount Decorative Sliding Door Hardware Ironwood Hardware - 7 ft. Loft Barn Door System - Flat Black - Unfinished Header Zinc-Plated Box Rail Hanger Kit Top Mount 72 in. Antique Bronze Barn Style Sliding Door Track and Hardware Set Soft Closed Hook Strap Black Rolling Barn Door Hardware Kit with 5 in. Fleur De Lis 6 ft. Track in Flat Black Barn Door Hardware Decorative Interior Sliding Door HardwareClassic Bent Strap Barn Style Sliding Door Track and Hardware Set 8 ft. Galvanized Box RailMatt Black Bent Strap Barn Door Hardware

1. The door itself should be at least 1-2″ wider on the side of each opening. 2. Make sure the track is level during installation. 3. Are the holes pre-drilled? If not, you need to make sure to locate the studs and drill through the track. The standard set of hardware works with doors of 1 1/4”-2” thickness. 1. Place hanger on the top and front of the door. Insert 2 1/2” placeholder into the groove (use cardboard from box). 2. Position hanger desired distance from edge of door (we recommend 2” from side of door or centered in stile) 3. Place a square to the hanger, and mark the holes. 4. Remove strap, drill a 3/8” clearance hole through the door on the markings previously made. 5. Remove wood debris from door, and place the hanger over the mounting holes. 6. Insert 2 1/4” x 3/8” hex bolts through the strap and door, and loosely attach the washer and nuts. 7. Place a square to the hanger again, and tighten the nuts. *The location of the track is determined by the height of your door.

1. To locate the position of the mounting holes in the wall use the following formula. 2” + (Door Height) = Measurement the lags will enter into the wall 2. PRE-DRILLED TRACK – Hold the track at the previous measurement and mark locations of holes. 3. NO HOLES IN TRACK – At the measured height locate the position of the studs and make a mark. Hold the track above the opening as if installed, and mark the track at the same locations as the studs in the wall. With a 3/8“ drill bit, drill into the track at the markings, including holes on each end for stops if needed. 4. Drill a 1/4” pilot hole at each marking in the wall. 5. With the holes drilled, hold the track up at the determined height, and place the 1 1/ 2″ spacer between the track and the wall. *NOTE – The stops are usually placed on each end of the track. However, they can be placed anywhere along the track to stop the door at a different location than the track’s end. 1. If needed, drill a 3/8″ hole into the track at desired location to ensure door opens fully.

2. Select the 1 3/4″ tap bolts and place them through the stop and then the track – use washer and nut to tighten. (You may also use a lag and spacer if the hole location lines up with a stud or if you are going into backing). 3. The stop can be twisted 180° along the line of the track to either stop the door earlier or later. 4. A rubber track stop pad will be included to soften the slide of the door when the end of track is reached. 1. The bottom door guide includes (1) L-shaped piece of angled steel. 2. For optimal result, cut a 1/4″ groove along the bottom of the door. 3. Place the guide on the floor with the door closed. It should be on the same side to which the door will slide. 4. Screw the bottom guide into the floor. The guide should be touching the door when the door is fully closed. As the door slides to the side, the guide needs to be in contact with the door at all times. *NOTE: Screws for bottom guide not included. Select depending on the floor material, tile, wood, carpet, etc.

SATURDAY Build the door (Steps 1-10).SUNDAY Hang the door (Step 11-13) Download and print the cut list. Before you begin: Measure the width of the door from the outside edges of the casing, then order a hardware kit with a track twice that width. Cut List for Installing a Sliding Door Designed to cover a 30-inch-wide opening with 4-inch casing on either side, this door measures 38½ inches wide by 2¼ inches thick by 83½ inches tall. 1x6 pine boards for the back: Cut the boards ½ inch shorter than the height of the opening to allow the door to pass over the floor guide. 1x3 strapping for blocking: Cut a length the width of the work surface; ours measured 48 inches. Then cut the rest of the board into blocking. 1x5 pine for the filler strips: Cut three rails the width of the door; ours measured 38½ inches. Then cut four stiles to fill between the rails, completing the upper and lower panels of the door. Our stiles measured 35 inches long for the upper panel and 34 inches long for the lower one, to create the 1-inch channel for the floor guide.

Pallet boards: About 60 boards at least 24⅜ inches long, mitered to parallel 45-degree angles on each end to fit. 1x6 cedar for face frame: Cut two stiles the height of the door; ours measured 83½ inches. Then cut four rails to span between the stiles; ours measured 27½ inches. Edge-glue and clamp two of those rails together to make the bottom rail. Rip 2 inches off one edge after the glue dries. 1x4 pine for the mounting rail: Cut it to match the track length; ours measured 77 inches. For our 30-inch-wide opening, seven 16s spanned the casing perfectly; you may need to rip the pine boards to width. Measure from the floor to the top of the door casing, then cut the boards ½ inch shorter on a miter saw. Gang the boards side by side, place the blocks along the outside edges, and use long bar clamps to cinch them together. Square up the assembly with longer strapping at the top and bottom edges. Screw the blocks and strapping in place, and remove the clamps. Use a miter saw to cut the 15 filler strips according to the cut list.

Add adhesive and set the top rail flush along the top of the boards; adhere the upper stiles below it, flush to the outside edges, and the middle rail below them. Add the lower stiles and rail, leaving a 1-inch channel for the floor guide that contains the door. Drive a 1¼-inch deck screw through each strip into each 16 it crosses. Use a straightedge to mark a centerline down the door's two inset panels. Set the miter saw to 45 degrees and cut one end off each pallet board. Starting at the top rail, butt the mitered ends of two pieces of similar thickness and color together at the centerline, forming an arrow. Use a combination square to mark the boards about ⅛ inch short of where they overlap the stiles, as shown. Miter the pieces to length, then dry-fit them. Repeat, one chevron at a time. For the boards that hit the corners, use the combination square to mark where the piece overlaps the stile and the rail. Cut the two angles on the miter saw, as shown. After installing the longer pieces, fill the rest of the pattern with scrap, cut to fit.

With the chevrons dry-fit in both panels, lift out one pair of boards at a time, apply panel adhesive to the undersides, and press them back in place. Using a pneumatic nailer, tack the boards in place with 1¼-inch brads, one near each corner of each board. Repeat the process, adhering and nailing each pair of boards as you work down both panels. At the miter saw, cut the cedar according to the cut list. Arrange the pieces rough-face down covering the filler strips. Clamp a pocket-hole jig at the end of a rail, even with one edge, and use the kit bit to drill a hole. Reset the jig along the other edge and repeat. Drill two pocket holes at each end of the upper and middle rails, as shown, and three at each end of the wider bottom rail. Tip: For the strongest bond, spread glue on both edges of the joint and drill the pocket holes in the rail so that the screw grabs the stile's edge grain. Apply wood glue to the ends of the rails and the adjoining edges of the mating stiles, then clamp the frame together.

Drive the screws provided with the kit into the edges of the stiles at each pocket hole, as shown. Remove the bar clamps. Attach the Face Frame Gently remove the face frame and set it aside. Apply panel adhesive in a zigzag pattern along the filler strips. Bring the frame back to the table and orient it rough-side up, hiding the screws. Lay it in place, as shown, and align it along all four edges. Tack it down with 1¼-inch brads every 8 inches or so. Rub On the Finish Lightly sand the entire door with 100-grit paper to knock down any splinters. Use a cotton rag to rub a liberal amount of paste wax into the wood. Center the rolling hardware on the width of the cedar stiles. It may help to remove the wheels first. Mark the screw locations, drill pilot holes into the filler-strip edge with a ⅛-inch bit, then screw the hardware in place, as shown. Replace the wheels and slip the track into their grooves. Measure between the door and the track to determine how high above the casing to mount it—¾ inch for this hardware.

Attach the Mounting Board At the miter saw, cut a length of 14 equal to the length of the track. We painted ours to match the wall. Use a stud finder to locate the framing and mark locations above the head casing. Level the mounting board above the casing and drill pilot holes through it and into each stud with a ⅛-inch bit. Secure it with 3-inch deck screws. Measure ¾ inch above the casing and mark two spots on the mounting board. Hold the track flat against the board, with its bottom edge at the marks. Using a 2-foot level, check that it's level, then mark each lag bolt location on the board. Set the track aside and drill 5⁄16-inch pilot holes at each mark. Thread a lag screw through one hole and a standoff and tighten it—not all the way—using a ⅜-inch socket wrench. Ratchet the rest of the lags in place, then go back and snug them all up. Roll the Door On Install a doorstop at one end. With a helper, hoist the door onto the track and slide it to the stop.